LOCAL CONCERNS MEETING
VERGENNES MAIN STREET BRIDGE
Main Street (VT Route 22A) Bridge No. 27 over Otter Creek
November 7, 2024
6:30 PM
AT THE VERGENNES OPERA HOUSE
120 MAIN STREET
VERGENNES, VERMONT
OR VIRTUALLY VIA ZOOM AT:
https://bit.ly/vergennes-lcm (note: if typing, use all lowercase)
Meeting ID: 886 2912 5662
PASSCODE: 345690
Presented by the City of Vergennes, the Vermont Agency of Transportation (VTrans) and Vanasse Hangen Brustlin, Inc. (VHB)
SUMMARY AGENDA: The project is anticipated to include reconstruction of Bridge No. 27 carrying Main Street (VT Route 22A) over Otter Creek. A construction date for the project has not yet been identified. The intent of the meeting is to briefly review the project area, review existing conditions of the bridge and roadway approaches, define the project development process, and to hear concerns from the community. There will be a brief presentation followed by a question-and-answer period with an opportunity for those attending (in person or virtually) to present any concerns they might have.
The meeting will be presented by the City of Vergennes, VTrans, and Vanasse Hangen Brustlin, Inc. (VHB), a consultant engineering firm based out of South Burlington working for VTrans to assist with conceptual design for the project. Representatives from the City of Vergennes, VTrans, and VHB will be available at the meeting.